1 | 划分汇水区域,计算各区域的屋面面积 | 2 | 确定暴雨重现期,计算暴雨强度 |
Divide watersheds, and calculate roof areas of various watersheds | Determine return period of rainstorm, and calculate intensity of rainstorm | ||
3 | 根据屋面面积,暴雨强度,计算雨水流量 | 4 | 布置雨水斗(按照荣成公司设计标准进行合理布置) |
Calculate flow rate of rainwater in accordance with roof area and intensity of rainstorm | Arrange rainwater hoppers (in reasonable way according to design standards of Rongcheng Company) | ||
5 | 管道的布置(按照设计院的走向或是按照经验布置) | 6 | 绘制系统图 |
Lay out pipelines (in accordance with trend defined by design institute or experiences) | Draw system diagrams | ||
7 | 方案审核确认 | 8 | 通过计算机专用软件进行管径校核 |
Examine and confirm program | Verify pipe diameters via dedicated computer software | ||
9 | 系统完成 | ||
Complete system |